Projects - Cityförster
Por um escritor misterioso
Descrição
Building on existing structures.The plot of Bar Center in Fier (Albania), located next to our projects Rinia Complex and Building Block on a central urban intersection and adjacent to an inner-city park, was occupied by an existing building from the late 1990s. This building – the plinth of an unfinished high-rise, which stood at three storeys high – was unassuming and unfitting for this prominent location; therefore, the owners approached us to extend the building and upgrade the existing floors. So we used the volume of the existing building as a starting point for the design.The addition activates the upper floors and makes them directly accessible from the new main square of Fier, to which the building now prominently orientates. The result is a stepped five-storey volume enclosed in a geometrical, rasterized façade. This geometrical façade, in turn, is partially clad in semi-transparent golden shading sheets, which function as a screen against the sunlight. Additionally, they bring more unity to the building
CITYFÖRSTER
Architects for Urbanity
KCAP and CITYFÖRSTER design new cultural building and district for Bratislava, Slovakia
Interview on greening cities - Felixx
Cityförster
Cityförster
News - Cityförster
Istropolis by KCAP and CITYFÖRSTER - Archiscene
New Istropolis, Bratislava, Slovakia
Cityförster
Projects - Cityförster in 2023 Space planning, Design elements, Sketches
Projects - Cityförster
Hanover, Germany. 29th Sep, 2020. The recycling house on Kronsberg from the construction company Gundlach and the architectural office cityförster. More than half of the building materials used in the new building
Interview with Oliver Seidel from Cityförster